- CHP
- Diesel Solutions
- Heat pumps / Chillers
- BESS
- Boilers
- Service
A compact CHP solution supplies electricity, heat, and process steam for Vatsak’s confectionery production site. The system ensures continuous energy access for thermal processing, packaging, and hygiene systems — boosting efficiency and production stability.
Two 1.5 MW gas-powered CHP units provide on-site electricity, heat, and optional process steam to support preparation, cooking, packaging, and storage with precise temperature and hygiene control.
| Parameter | Value |
|---|---|
| Location | Vinnytsia region, Ukraine |
| Installed capacity | Over 3 MW |